01394 200328
info@ardentlc.co.uk

Category: Case Studies

Lift advice: Flat Living article

🛗 From the initial site visit, right through to project completion, Ardent Lift Consultancy can support you on every level!This article in Flat Living Magazine will show you just how invaluable we can be.

New Case Study!

🏬 Read our most recent case study on a multi-residential block lift refurbishment, exceeding Client’s expectations on this high value modernisation project!

A Case Study: Modernising Existing Lift Equipment

📘 We share a case study of a North London Block that required existing lift equipment to be modernised on behalf of MIH Property Management.

Case Studies

Take a look at our newly updated case studies to see some of our success stories and read some of our clients testimonials.

1930’s Lift Restored to Former Glory!

🛗  Read our article in this edition of Flat Living Magazine about a refurbishment we completed on a beautiful 1930s lift!

A tale of two lift shafts… a case study

? Read our article about two very similar lifts with one big difference…

Choosing the right lift expert

In the April edition of Flat Living Magazine, Gareth Lomax of Ardent Lift Consultancy explains why it is essential to seek expert advice when seeking a solution to the issues you may be experiencing with your lift. Follow the link to read the article

Lift Entrance after refurbishment

Full Lift Refurbishment for Residential Building in West Sussex

Ardent were commissioned by Courtney Green Ltd to undertake the condition survey and operational test on a passenger lift located within a residential building in West Sussex. The lift was originally installed in 1971 and was showing signs of advanced wear. As there had been no significant alterations to the unit since installation, the lift…
Read more

Lift shaft

Heartache in the city

The lift installations in a block of flats can be a subject of much discussion and heartache for both leaseholders and tenants alike, but with a little planning for the future and initial discussions these problems can be avoided.   In this edition of Flat Living Magazine, we explain the importance of planning and provide our…
Read more

Lift Car After Shot

Achieving the ‘impossible’…

Ardent Lift Consultancy were assigned to a project in 2016 in North London which had got off to an inauspicious start. We were appointed hot on the heels of the previous lift consultancy being removed from the contract by the Board of Directors for the property, following several months of debate and discord. In essence,…
Read more

Ardent Lift Consultancy makes client a substantial saving

Case Study: 14-16 Great Pulteney Street, London Further to the article on refurbishment/replacement in the September issue of Flat Living Magazine, we felt a case study would further demonstrate the benefits of correctly specifying lift works to ensure the client obtains the best value. We were instructed to advise on renewal of a passenger lift…
Read more

Seven Lift Refurbishment Scheme

In the UK, most of our major cities are reaching the point where space is now at a premium, with fewer and fewer areas to build new homes. But thanks to the passenger lift, there are always opportunities to build vertically, maximising the space allocated by the footprint of a property. Many residential blocks benefit…
Read more

Recent Lift Refurbishment Scheme

Ardent Lift Consultancy recently tendered and oversaw the completion of a 4 car group of lifts in a commercial property in the heart of Birmingham City Centre. We surveyed the 8 floor property and ascertained that the lifts were in poor condition with primary issues surrounding controllers and door equipment. The client had been given…
Read more