See some of our success stories below

Lift Restored to Former Glory

Read our case study about a refurbishment we completed on a beautiful 1930s lift.

St Leonards Hospital

A multi-lift modernisation project successfully completed despite the challenges faced during a global pandemic!

A Positive Outcome!

Read how teamwork and dedication helped deliver a project in the face of adversity.

Client Testimonials

Don’t take our word for it – here’s what our clients say:

One of our residential developments in London had lift reliability issues, so we engaged with Ardent Lift Consultancy to advise our Client on the options available to them to ensure reliable lift service at the property. For HML and our Client, it was paramount Ardent delivered a cost-effective solution.

The Ardent team recommended a new lift installation rather than refurbishing the existing lift which offered greater load capacity, operational speed, and lift performance. Gareth and Chris successfully managed the project during the Covid19 situation and ensured the lift contractors could safely deliver the project.

From our initial dealings with Ardent to the completion of the project, we have been impressed by their work ethic and would highly recommend Ardent Lift Consultancy.

Wayne Savage BA (Hons), MIRPM AssocRICS

Senior Property Manager 

Today I attended the handover of the third and final refurbished lift at St Leonards. It was a pleasure to see previously dilapidated, unreliable lifts in such a good condition.

The construction works led by Martin Meltzer, Site FSM Tony Bryan together with the concise and fundamentally wholesome scope developed and managed by Chris Eaton of Ardent allowed PIP lifts to execute such works.

This investment has the patient at the centre of its rationale providing safe, compliant, reliable lifts within a much-needed local healthcare resource in the heart of Hoxton. It also illustrates the great collaborative work between FM Ops and Construction.

A great all-round effort with a patient centric result.

Michael John Turrell 

Technical Service Manager – London 

We were delighted with both the quality of the final outcome and the management of the work-programme.

The project was only a week behind schedule, which is nothing given its complexity.

After a few minor teething issues we have a lift, which looks as beautiful when it was originally installed, but now moves with the smoothness of a modern one.

Philip Percival

Director | Heatherlawns Property Management Ltd

Thanks to all the team.

I must say the implementation of this lift project is a fantastic example of excellent project teamwork between all parties concerned.

Well done everyone!

Tony Bryan

Facilities Services Manager – City & Hackney | Tower Hamlets