Personal, professional, and approachable team
Measured modernisation to maximise value
Independent, jargon-free expertise you can trust
Vetted, approved suppliers for assured performance
Building Safety Act 2022
The Building Safety Act 2022 introduced significant reforms to building safety in England. The subsequent Building Regulations amendments in 2023 established new dutyholder responsibilities, including the role of the Building Regulations Principal Designer.
ARDENT provides Principal Designer services for lift refurbishment and replacement projects, helping coordinate design work, manage compliance information and support clients through the relevant building safety requirements, including Gateway 2 and Gateway 3 where applicable.
What is the difference between a BRPD and a PD BSA?
There is no legal difference between the two terms. BRPD (Building Regulations Principal Designer) and PD BSA (Building Safety Act Principal Designer) refer to the same statutory role.
Under Part 2A of the Building Regulations 2010 (as amended), the official legal title is Principal Designer. Both terms are used within the industry to distinguish this role from the Principal Designer appointed under CDM 2015.
The term PD BSA became widely used following the Building Safety Act 2022, which introduced the new dutyholder regime. However, as the specific duties are set out within the Building Regulations, BRPD is increasingly used by regulators and compliance specialists.
THE CHALLENGE
The higher-risk building major works paradox
For many years, major lift refurbishment and replacement projects followed a relatively straightforward route: survey, specification, Section 20, tender, contractor appointment and works.
For projects within existing Higher-Risk Buildings, the Building Safety Act and Building Safety Regulator requirements introduce an additional approval stage before relevant building work can commence.
This can create a potential conflict between the lift procurement process, Section 20 consultation and the Gateway 2 approval process.
The risk of delay
The BSR approval process can introduce a significant period between contractor appointment and the commencement of works.
- Expiring contractor quotations
- Increased material and labour costs
- Further contractor negotiations
- Potential Section 20 complications
- Extended periods with a non-operational lift
The solution is to plan the BSR process into your lift procurement strategy from the outset.
OUR SERVICE
A joined-up approach to PD BSA
Our PD BSA service integrates specialist lift expertise with Building Regulations compliance, helping you navigate the BSR process, coordinate the information required for Gateway 2 and Gateway 3, and maintain the Golden Thread for your building.
Lift expertise
Specialist knowledge of lift design, specification, procurement and contractor information.

Building Regulations
Coordination of compliance information and Building Regulations Principal Designer duties.
BSR processes
Gateway 2 and Gateway 3 application coordination and liaison with the BSR.
Golden Thread
Coordination of project information for the building’s ongoing safety records.
Contact ARDENT to speak with lift specialists about major works in your HRB
THE PROJECT JOURNEY
One coordinated process, from specification to the Golden Thread

Lift specification
Define the proposed scope and identify the information required.

Procurement
Support the tender process and coordinate Gateway 2 information.

PD BSA & Gateway 2
Prepare and submit the application and manage the BSR process.

Construction
Maintain Building Regulations compliance and manage information during the works.

Gateway 3
Coordinate completion information and support the final submission

Golden Thread
Capture and organise key project information for the building’s future use.
Unsure About Your Building Safety Responsibilities?
Our team can help you understand the Principal Designer role under the Building Regulations and discuss the requirements relevant to your project.
GET THE APPLICATION READY BEFORE THE PROJECT IS READY TO START
GATEWAY 2
The Gateway 2 stage is often where the greatest potential for programme delay occurs.
We work with you during the procurement and pre-construction period to develop and coordinate the information required for the BSR application.
Our objective is to have the application prepared to the required level as early as reasonably practicable, so that the BSR process does not become an avoidable late-stage addition to the project programme.
Our GATEWAY 2 support includes:
✓ Review of existing information
✓ Review of lift contractor design
✓ Building Regulations requirements
✓ Design responsibility coordination
✓ Compliance documentation
✓ Fire and building services information
✓ Gateway 2 submission package
✓ Application monitoring
✓ BSR liaison and responses
The Procurement Challenge
BSR approval is required before works can start, which can create a conflict with Section 20 and the lift tender process.
Our early involvement helps you plan the application alongside procurement – avoiding unnecessary delay and protecting your project.
PD BSA
Supporting the project through construction
Gateway 2 approval is not the end of the Building Regulations process.
Ardent can continue as Principal Designer – Building Safety Act throughout the construction phase, coordinating design changes, compliance information and the information required for Gateway 3 and the Golden Thread.
- Review proposed design changes
- Coordinate Building Regulations implications
- Review contractor information
- Liaise with lift contractors and designers
- Monitor Gateway 3 information
- Maintain outstanding information schedules
- Identify compliance issues requiring resolution
COMPLETION AND BEYOND
GATEWAY 3

We coordinate the final information required to demonstrate compliance and support the Gateway 3 process.
✓ As-built information
✓ Testing and commissioning
✓ Lift certification
✓ Compliance evidence
✓ Contractor information
✓ Gateway 3 submission
THE GOLDEN THREAD
Keeping the information

A lift refurbishment generates important information that needs to remain useful after the project has finished.
✓ Existing lift information
✓ Design and specification
✓ Approved Gateway 2 information
✓ Design changes
✓ As-built information
✓ Testing and commissioning
✓ Certification
✓ Gateway 3 information
WHY ARDENT?
Lift specialists first. Building Safety Act expertise built around that experience.
Our team brings extensive experience of lift modernisation, refurbishment and replacement projects, giving us a detailed understanding of the technical information required for a successful BSR Gateway application.
Extensive lift industry experience and technical knowledge
Established Gateway 2-3 procedures and documentation
Independent, practical advice
A single coordinated approach to your project
PROTECTING YOUR PROJECT
Plan the Gateway application process alongside procurement – not after it
The BSR approval process needs to be considered alongside the commercial and procurement strategy for an HRB lift project.
We can help you consider information requirements, tender validity, programme allowances and Gateway 2-3 preparation during the lift procurement process.
WHO WE WORK WITH
Is this service for your project?
Our PD BSA service is particularly suited to clients planning lift refurbishment or replacement works within existing Higher-Risk Buildings.
- Principal Accountable Persons (PAPs)
- Accountable Persons (APs)
- Freeholders
- Managing Agents
- Resident Management Companies (RMCs)
- Right to Manage Companies (RTMs)
- Housing Associations
- Property Managers
- Asset Managers
- Building Owners
Planning a lift project in an existing HRB?
Let’s discuss your project and how the Building Safety Act requirements can be integrated into your lift procurement and project programme. Get independent, expert advice from Ardent Lift Consultancy.
Call 01394 200 328
Email info@ardentlc.co.uk
Gareth Lomax
Dan Cheesman
Meet our full team
Get to know the dedicated experts behind our success and discover how their skills drive exceptional results.
Trusted feedback from our clients
See what our clients have to say about our trusted expertise and exceptional service.
We contacted Ardent Lift Consultancy to undertake a survey of the 8 lifts serving the estate at St Charles Hospital. Their survey report identified the different designs, ages, and condition of the lifts at the property, and they produced different recommendations for each lift on this basis.
Ardent were instructed to specify, tender and project manage this complex and varied contract. They delivered a well-managed project, which came in on time and under budget
Martin Meltze – MAPM
December 2022
Thanks to all the team.
I must say the implementation of this lift project is a fantastic example of excellent project teamwork between all parties concerned.
Well done everyone!
Tony Bryan – NHS Property Services
One of our residential developments in London had lift reliability issues, so we engaged with Ardent Lift Consultancy to advise our Client on the options available to them to ensure reliable lift service at the property. For HML and our Client, it was paramount Ardent delivered a cost-effective solution.
The Ardent team recommended a new lift installation rather than refurbishing the existing lift which offered greater load capacity, operational speed, and lift performance. Gareth and Chris successfully managed the project during the Covid19 situation and ensured the lift contractors could safely deliver the project.
From our initial dealings with Ardent to the completion of the project, we have been impressed by their work ethic and would highly recommend Ardent Lift Consultancy.
Wayne Savage BA (Hons), MIRPM AssocRICS
Late 2018
Learn more about our work and impact
Explore how our expertise delivers tailored solutions and measurable results across various projects and sectors.





